Concrete needed
Total rise 1 ft 9 in
Volume of solid steps only. Footings, a base layer, rebar and forms are separate; follow your local requirements for footing depth and reinforcement.
How this result was calculated
- Layer by layer
1: 48 × 7 × 58; 2: 48 × 7 × 47; 3: 48 × 7 × 36Each riser-high layer runs from that riser face to the back of the platform. - Total (closed form)
W × h × R × ((R − 1) × g ÷ 2 + P) = 48 in × 7 in × 3 × ((3 − 1) × 11 ÷ 2 + 36) → 27.42 cu ft (1.015 cu yd) - With waste
27.42 cu ft (1.015 cu yd) × 1.1 = 30.16 cu ft (1.117 cu yd)
All values (table)
| Item | Value | Note |
|---|---|---|
| Risers | 3 | |
| Riser height | 7 in | |
| Going | 11 in | |
| Width | 48 in | |
| Platform depth | 36 in | top landing |
| Volume | 27.42 cu ft (1.015 cu yd) | |
| With 10 % waste | 30.16 cu ft (1.117 cu yd) | |
| Bags | n/a | enter a yield |
How the volume is worked out
Solid steps can be read as stacked slabs, one riser high each. The bottom slab runs from the face of the first riser all the way to the back of the platform; each slab above is one going shorter. Adding them gives a closed formula: width × riser × risers × ((risers − 1) × going ÷ 2 + platform depth). The calculator does both and the tests check they agree.
Count the platform at the top (for example in front of a door) as the last step. If the door threshold is the top, set the platform depth to the landing you want there.
Worked example
Three risers of 7 in, 11 in goings, 48 in wide, with a 36 in platform at the top:
- Slabs: 48 × 7 × 58 + 48 × 7 × 47 + 48 × 7 × 36 = 47,376 cu in.
- 27.42 cu ft = 1.02 cu yd; with 10 % waste 30.16 cu ft.
- If your bag says it yields 0.6 cu ft, that is ⌈30.16 ÷ 0.6⌉ = 51 bags.
These are automated test fixtures (concrete K1 and the bag test). Always use the yield on the bag you buy.
Not included
Footings below the frost line, a gravel base, reinforcement, forms and any hollow (stepped-underside) design are not part of this volume. Outdoor steps attached to a house usually need footings and reinforcement set by your local code; ask before you pour.
Questions people ask
How do I calculate how many concrete steps I need?
Measure the height from the ground (or footing top) to the door threshold or landing, divide by your maximum riser and round up. For example, 21 in to a door at a 7 3/4 in maximum is ⌈2.71⌉ = 3 risers of 7 in, with the top platform as the last step. Then enter the risers here for the concrete volume.
Related tools and guides
- Deck Stair Calculator Deck height, sloping ground, landing pad and board treads, with landing distance.
- Stair Calculator Risers, treads, total run, angle and a to-scale side view from one height.
- How many stairs for a height Risers, treads and run for common heights, in one table.
- Stair Angle Calculator Angle, grade and pitch from rise and run, or the run needed for a target angle.